What Is a Planned Preventative Maintenance Contract?

Pulse report screen, Priority First

Last updated: 25 November 2026

A planned preventative maintenance contract is an agreement under which a contractor services a building's assets (lifts, HVAC, fire systems, electrics) on a fixed schedule to prevent breakdowns, rather than repairing them after they fail. Scheduled servicing of this kind can extend asset life by 20 to 40%, according to Global Facilities (2024).

Key Takeaways

  • A planned preventative maintenance (PPM) contract sets fixed service intervals for building assets instead of waiting for them to break.
  • PPM schedules in the UK are commonly built against SFG20, the industry-standard maintenance library published by the Building Engineering Services Association.
  • Scheduled preventative maintenance can extend asset life by 20 to 40% on average, according to Global Facilities (2024).

40%: Scheduled preventative maintenance can extend asset life by 20 to 40% on average, according to Global Facilities (2024).

A planned preventative maintenance contract is a formal agreement in which a contractor commits to servicing specified building assets at set intervals, aiming to catch wear before it causes failure. The term is usually shortened to PPM, and it covers assets such as lifts, boilers, air handling units, fire alarms, emergency lighting and electrical distribution boards.

The contract sets out which assets are covered, how often each is visited, what checks are performed on each visit, and what evidence is produced as proof of completion. It differs from a reactive maintenance contract, where a contractor only attends once something has already stopped working. The Institute of Workplace and Facilities Management treats PPM as the standard industry term for this kind of scheduled servicing carried out to satisfy statutory duties.

Our view: Priority First believes that building compliance fails quietly in the handovers between contractors, so one owner should hold the whole compliance calendar. When lift servicing sits with one supplier, fire alarm testing with another, and electrical inspection with a third, nobody is accountable for the gaps between their visits. A single party holding the full PPM schedule, as outlined under the Provision and Use of Work Equipment Regulations 1998, closes that gap rather than relying on each contractor to flag another's oversight.

What should a PPM agreement include?

A PPM agreement should name every covered asset, its service frequency, the scope of each visit and the compliance evidence the contractor will produce. Most UK agreements are built against SFG20, the BESA-published schedule library that has set maintenance frequencies for building services since 1990.

A complete agreement typically specifies:

  • Asset register: every piece of equipment covered, with make, model and location.
  • Service frequency: how often each asset is visited, set against SFG20 or manufacturer guidance.
  • Scope per visit: the exact checks, tests and parts replacements carried out.
  • Compliance evidence: certificates, test records or digital logs proving each visit happened.
  • Response times: how quickly the contractor attends if a scheduled check reveals a fault.
  • Reporting: how the client reviews completed works, usually through a CAFM (computer-aided facilities management) system or client portal.

Without a documented scope, a client cannot prove to an insurer, an auditor or the Health and Safety Executive (HSE) that statutory maintenance actually took place.

Planned preventative maintenance is not named as a legal requirement in UK law, but several regulations require equipment to be kept in efficient working order, which in practice demands a scheduled maintenance regime. The Provision and Use of Work Equipment Regulations 1998 (PUWER) places a duty on employers to maintain work equipment so it remains safe to use.

The Electricity at Work Regulations 1989 similarly requires fixed wiring and portable electrical equipment to be maintained to prevent danger, which the HSE's guidance document HSG107 expands on. Neither regulation specifies exact intervals, which is why most UK facilities managers reference SFG20 to set defensible frequencies. The Health and Safety at Work etc. Act 1974 sits above both as the overarching duty to manage workplace risk, and a documented PPM contract is the usual way a building owner demonstrates that duty has been met.

PPM versus reactive and predictive maintenance

These three approaches differ in when work happens and what triggers it. A PPM contract schedules work in advance; reactive maintenance responds after failure; predictive maintenance uses condition data to trigger work only when an asset shows early signs of wear.

Approach When work happens Typical use case
Planned preventative (PPM) Fixed intervals, set in advance Lifts, fire alarms, HVAC, statutory testing
Reactive After a fault or breakdown occurs Non-critical, low-cost, easily replaced items
Predictive Triggered by sensor or condition data High-value plant with continuous monitoring

PPM and predictive maintenance are often blended on larger sites: PPM covers statutory and safety-critical checks, while predictive methods add sensor-based monitoring on specific high-value assets. Reactive maintenance remains appropriate for low-risk items where failure carries no safety or compliance consequence.

Who arranges PPM and what does it typically cost?

The building owner or managing agent is responsible for arranging PPM, though the duty is often delegated to a facilities manager or outsourced to a contractor managing the full schedule. On commercial and premium residential property, this is commonly bundled into a wider facilities management arrangement alongside security and front-of-house services, and is not usually bought as a standalone line.

UK PPM pricing is not published in standardised benchmarks, because costs vary by asset count, building age and service frequency. As a general guide, a small office might pay a modest fixed monthly fee covering fire safety and electrical checks, while a large mixed-use development with lifts, HVAC and multiple fire systems will carry a correspondingly higher contract value. Most contracts are priced as a fixed annual fee per asset category, with reactive call-outs charged separately or included up to a capped number of hours.

Your PPM contract checklist

  • List every asset that requires statutory or manufacturer-recommended maintenance.
  • Set service frequency against SFG20 or the manufacturer's own guidance.
  • Confirm what evidence each visit produces: certificate, photo log or digital record.
  • Check response times for faults found during a scheduled visit.
  • Confirm who holds the master compliance calendar across all trades.
  • Ask how the contract handles missed visits or delayed attendance.
  • Review how completed work is reported back, ideally through a CAFM or client portal.

FAQ

What does PPM stand for in a maintenance contract?

PPM stands for planned preventative maintenance, meaning servicing carried out on a fixed schedule to prevent failure before one occurs.

What is SFG20 and how does it relate to PPM contracts?

SFG20 is the UK industry-standard library of maintenance schedules, published by the Building Engineering Services Association since 1990, and it sets the recommended frequency and scope for servicing most building assets.

What industries or assets commonly use planned preventative maintenance contracts?

PPM contracts commonly cover lifts, HVAC systems, fire alarms, emergency lighting and electrical distribution, and are standard across commercial offices, residential blocks, care homes and mixed-use developments.

Who is responsible for arranging PPM in a workplace?

The building owner or employer carries the underlying duty under PUWER and the Electricity at Work Regulations 1989, though this is routinely delegated to a facilities manager or outsourced contractor.

Keeping your PPM schedule in one accountable place

Priority First manages planned preventative maintenance as part of its facilities management service, coordinating building upkeep and compliance alongside on-site security so nothing is left to separate contractors working from separate calendars. This matters most on sites where security, concierge and maintenance teams already share the same building daily.

"A strong tender names the people who will actually deliver the contract, explains how cover is maintained when things go wrong, sickness, no-shows, emergencies, and prices transparently enough that you can see the officer's pay within it," said Mo Hassan, Managing Director, Priority First

Priority First covers prime central London, West London, and contracts across the West Midlands and Bedfordshire. If your building's maintenance and compliance schedule is split across multiple contractors, get in touch with Priority First for a facilities management quote.

Written by
Gus — Facilities Manager

Gus is a Facilities Manager at Priority First, looking after the building side of the company's contracts: planned maintenance, managing specialist contractors and the day-to-day running of residential and commercial buildings in London.