Schedule of Condition in a Commercial Lease

Last updated: 26 November 2026
- Key Takeaways
- What a schedule of condition is and why commercial leases use one
- How a schedule of condition limits repair and dilapidations liability
- Who prepares and pays for a schedule of condition, and when to commission it
- Step-by-step: how a schedule of condition is prepared
- Schedule of condition vs schedule of dilapidations: what's the difference
- FAQ
- Protecting the building the schedule describes
- Related Reading
A schedule of condition is a detailed photographic and written record of a property's state at the start of a commercial lease. It is used to cap or exclude a tenant's repairing liability at lease end. It only works if it is commissioned at the right time, drafted thoroughly, and properly annexed to the lease. One sample case without one saw a claim exceed £120,000, Kingston Surveyors (2025).

Key Takeaways
- A schedule of condition only caps liability if it is referenced in the lease itself, not left as a standalone document a landlord can ignore.
- Section 18(1) of the Landlord and Tenant Act 1927 limits damages under a dilapidations claim to the drop in the property's value, not the cost of repairs.
- Commissioning the schedule before heads of terms are agreed gives a tenant the strongest negotiating position, because once the lease is signed the opportunity is largely gone.
What a schedule of condition is and why commercial leases use one
A schedule of condition is a factual, dated record of a property's physical state, usually a written report backed by photographs, made before a tenant moves in. It exists to answer one question at lease end: was this defect already there, or did the tenant cause it.
Without one, a tenant's repairing covenant is judged against an assumed standard, often "good and substantial repair," regardless of how tired the building already was. A landlord can then claim for cracked plaster, worn flooring or ageing services that existed long before the tenant signed anything. A schedule of condition fixes the starting point as evidence, not memory. The record decides what the tenant is responsible for returning.
This matters most for older buildings, short lets and any space taken on an "as seen" basis. A new-build on a long lease carries less of this risk. A tired Victorian conversion on a five-year term carries a great deal of it.
How a schedule of condition limits repair and dilapidations liability
A schedule of condition limits liability in two separate ways, and a tenant needs both to be working. The first is contractual: the schedule is attached to a qualified repairing covenant, so the tenant's obligation is to keep the premises in no worse condition than the schedule records, rather than in some abstract "good" condition. Get the drafting wrong and the schedule becomes a bystander document the court can disregard.
The second limit is statutory and applies regardless of what the lease says. Section 18(1) of the Landlord and Tenant Act 1927 caps dilapidations damages at the diminution in the value of the landlord's reversion. This is the drop in the property's value caused by the disrepair, however much repair work would actually cost. A landlord cannot recover more than the property has actually lost in value, even if the repair bill is higher. Higgs LLP (2024) records a case where diminution in value capped damages at £900,000 under Section 18(1), regardless of the raw repair cost claimed.
The gap between repair cost and diminution in value can be substantial. Anstey Horne (2025) sets out an illustration where repairs were costed at £200,000 but diminution in value was only £120,000. The landlord was entitled to recover just the lower figure. A schedule of condition and the Section 18 cap work together. The schedule narrows what counts as a breach, and the cap limits what can be claimed even where a breach is proven.
Who prepares and pays for a schedule of condition, and when to commission it
Either party can commission a schedule of condition, but it is almost always in the tenant's interest to instruct and pay the surveyor. The landlord has little incentive to produce a document that limits their own future claim. A tenant who waits for the landlord to offer one is usually waiting for nothing.
Timing decides whether the schedule has any legal force. It needs to be commissioned, completed and agreed before heads of terms are finalised, so it can be referenced and annexed to the lease itself as a defined document. It should not be attached as an afterthought once terms are settled. A schedule produced after completion, or never formally tied into the lease wording, offers far weaker protection even if the photographs themselves are perfectly good.
The value of acting fast under pressure applies just as much outside dilapidations. Priority First was contacted at 12:30 after a commercial site in Covent Garden was found broken into overnight, with stock and premises exposed and no security provider in place. The cost was agreed on that same call, and an SIA-licensed operative was on site by 14:30, two hours after first contact (as of August 2026). The lesson is the same whether it's a break-in or a lease: delay turns a fixable position into a costly one.
Step-by-step: how a schedule of condition is prepared
Preparing a schedule of condition follows a defined sequence. Missing a step weakens the finished document's standing if it is ever challenged.
- Instruct a surveyor with commercial dilapidations experience, ideally before lease terms are agreed.
- Survey the property room by room, recording the condition of fixtures, finishes, services and structure.
- Photograph systematically, with consistent lighting and angles, dated and referenced to a floor plan.
- Draft the written report, cross-referencing each photograph to a specific defect or condition noted.
- Circulate the draft to both landlord and tenant for comment, correcting disputed descriptions before it is finalised.
- Agree and sign the final version, with both parties initialling each page or photograph schedule.
- Annex the document to the lease, naming it explicitly in the repairing covenant clause.
- Retain copies securely, since the schedule may not be needed again for years, sometimes a decade or more.
Skipping the circulation and sign-off stage is a common failure. A schedule neither party has formally agreed is far easier for a landlord's surveyor to dismiss at lease end.
Schedule of condition vs schedule of dilapidations: what's the difference
A schedule of condition is a preventative record made at the start of a lease. A schedule of dilapidations is a claim document made at the end of a lease, listing alleged breaches of covenant. Confusing the two is one of the more common ways a tenant ends up unprotected.
| Schedule of condition | Schedule of dilapidations | |
|---|---|---|
| When prepared | Start of lease | End of lease, or on notice to quit |
| Purpose | Records existing condition to cap liability | Lists breaches and claims for repair cost |
| Who typically commissions | Tenant (usually) | Landlord |
| Legal effect | Limits what counts as disrepair | Sets out what the landlord is claiming |
| Governed by | Lease drafting and annexation | RICS Professional Standard: Dilapidations (England and Wales) and the Dilapidations Protocol |
The RICS professional standard sets out the procedure landlords and surveyors are expected to follow when a schedule of dilapidations is served. This includes notice periods and the exchange of quantified demands. A schedule of condition has no equivalent formal procedure; its force comes entirely from how carefully it was prepared and how firmly it is tied into the lease. One document prevents a dispute. The other starts one.
Commissioning a surveyor and negotiating the wording into the lease adds time and cost upfront. This usually runs from a few hundred to low thousands of pounds, depending on the size and condition of the property. A poorly drafted or thinly photographed schedule can be challenged or simply disregarded by a court. It is only as strong as the thoroughness of the report and how properly it is cross-referenced in the lease. OBI Property sets out common drafting pitfalls that weaken a schedule's standing even when the survey itself was done well.
FAQ
How much does a schedule of condition cost in the UK?
There is no fixed national fee; cost depends on the surveyor instructed, the size of the property and how detailed the report needs to be. A tenant should ask a surveyor for a quote before heads of terms are agreed, so it can be built into the lease negotiation timeline.
What happens if there is no schedule of condition in place when the lease ends?
Without one, the tenant's repairing obligation is judged against an assumed baseline, not evidence of what actually existed at the start. Kingston Surveyors (2025) records a sample case where the absence of a schedule of condition contributed to a substantial total claim.
Can a schedule of condition be updated or disputed during the term of a lease?
A schedule of condition is usually fixed at lease start and not routinely updated, since its purpose is to record a single point in time. Either party can dispute its accuracy later, which is why clear photography, dated records and a formal sign-off process matter at the outset.
What should be checked to make sure a schedule of condition is enforceable?
Check that the schedule is explicitly named and annexed in the lease's repairing covenant, not left as a loose attachment. Check that both parties signed or initialled it, that photographs are dated and referenced to specific defects, and that the surveyor who prepared it is properly qualified.
Protecting the building the schedule describes
A schedule of condition protects a tenant's position on paper. What happens inside the building over the following years is a separate question, and it is usually where the real risk sits. Missed maintenance, undocumented access or disrepair nobody flagged can worsen unnoticed. Priority First's Building Audit & Risk Assessments service gives a structured, dated record of a building's condition and operational risk. It applies the same discipline a schedule of condition does at lease start, carried through the life of the tenancy. If a commercial lease is coming up for renewal or dilapidations are on the horizon, get in touch with Priority First to discuss what an audit would cover.