The external wall fire review EWS1 form is a standardised document used by surveyors to assess fire risk in a building's external cladding system before a mortgage lender will value a flat. Introduced in December 2019 by RICS and UK Finance, it remains central to high-rise property transactions, though a completed form is valid for up to 5 years from signature, per UK Finance / RICS (2022).

Key Takeaways

  • RICS and UK Finance created the external wall fire review EWS1 form in December 2019 to standardise cladding risk assessment for mortgage lending; Priority First advises building owners and leaseholders on what this means for their properties.
  • 48% of mortgage valuations for flats in buildings seven storeys and above required an EWS1 form or equivalent in Q2 2024, down from 62% in Q2 2023, according to RICS (2024).
  • An EWS1 form is valid for up to five years from the date it is signed, per UK Finance / RICS (2022).
  • Only 2.6% of EWS1 forms had been uploaded to the Building Safety Information Portal by April 2024, according to End Our Cladding Scandal's written evidence to Parliament (2024).
  • The UK Government tracks 4,724 high-rise buildings with unsafe cladding, of which 39% are fully remediated and 46% are still waiting for works to start, per Hansard (2026).

48%: 48% of mortgage valuations for flats in buildings seven storeys and above required an EWS1 form or equivalent in Q2 2024, down from 62% in Q2 2023, according to RICS (2024).

What is an EWS1 form?

An EWS1 form is a standardised certificate confirming whether a qualified fire safety professional has reviewed a building's external wall construction and found it acceptable for mortgage lending purposes. RICS (the Royal Institution of Chartered Surveyors) and UK Finance jointly published the form in December 2019, following the Grenfell Tower fire of June 2017, to give mortgage valuers a consistent format for recording cladding risk.

The form itself is short: a surveyor or fire engineer inspects the external wall system — the cladding, insulation, balconies and fire-stopping between floors — and assigns a rating. That rating tells the valuer and the lender whether remedial works are needed before the flat can be mortgaged at full value.

It is not a general fire risk assessment of the whole building. The EWS1 form looks specifically at the external wall, not internal fire doors, alarms or evacuation routes, which fall under separate legislation such as the Fire Safety (England) Regulations 2022 and the Regulatory Reform (Fire Safety) Order 2005.

Which buildings require an EWS1 form under current guidance?

Not every residential block needs an external wall fire review. RICS's updated valuation standard sets proportionate criteria based on height, cladding type and known fire risk, rather than applying a blanket rule to every multi-storey building.

Buildings most likely to need an EWS1 form include those over 18 metres (roughly six storeys) with ACM, high-pressure laminate or certain insulated render cladding systems. Buildings below 11 metres are very unlikely to need one at all, following guidance changes designed to stop unnecessary requests spreading down into lower-rise blocks that pose minimal risk.

New RICS guidance introduced in 2021 meant nearly 500,000 leaseholders would no longer need an EWS1 form, according to Housing Today, citing then-Housing Secretary Robert Jenrick (2021). RICS's Nigel Sellars, Senior Specialist for Residential Valuation, said: "Mortgage valuations must give lenders and borrowers clear and proportionate advice," in the same report.

Demand has fallen since. 48% of mortgage valuations for flats in buildings seven storeys and above required an EWS1 form or equivalent in Q2 2024, down from 62% in Q2 2023, per RICS (2024). That decline reflects both narrower criteria and ongoing remediation work across the high-rise stock.

How much does an EWS1 assessment cost, and who pays?

An EWS1 assessment typically costs several hundred to several thousand pounds per building, depending on height, cladding complexity and whether intrusive investigation — opening up sections of wall to inspect insulation and cavity barriers — is required. Simple single-material facades cost far less to assess than mixed-cladding high-rises needing multiple site visits.

Responsibility for payment usually falls to the freeholder or the building's managing agent, since the assessment relates to the structure rather than any individual flat. In practice, costs are frequently recovered from leaseholders through the service charge, which has become a significant point of dispute following the Grenfell Tower fire and subsequent building safety reforms.

The Building Safety Act 2022 introduced leaseholder protections limiting what can be passed on for historical fire safety defects in buildings over 11 metres, which has shifted some of this cost burden back towards developers and freeholders. Leaseholders uncertain whether a charge is legitimate should request a breakdown and, where needed, challenge it at the First-tier Tribunal (Property Chamber).

What do the EWS1 rating classifications mean?

EWS1 ratings tell a mortgage valuer whether remedial works are needed and whether those works affect the property's value. The form uses two options, A and B, each split into sub-categories.

Rating Meaning Mortgage impact
A1 No combustible materials in the cladding system No impact on valuation
A2 Combustible materials present but fire risk judged low; no remedial works needed No impact on valuation
A3 Combustible materials present; risk judged significant enough that remedial works are required Valuer may need to assume a nil value until works complete
B1 Assessed by a fire engineer; adequate fire safety measures in place No impact on valuation
B2 Assessed by a fire engineer; fire safety measures inadequate and remedial works required Valuer may need to assume a nil value until works complete

An A3 or B2 rating does not mean the building is unsafe to occupy — interim fire safety measures, such as waking watch patrols or revised evacuation strategies, are usually put in place by the freeholder while remediation works are scheduled. It does mean the property is harder to sell or remortgage until works are complete or funded through a recognised remediation scheme.

How does an EWS1 form affect mortgage lending and valuations?

An EWS1 form directly shapes whether a mortgage lender will offer a loan and at what valuation. Lenders use the form's rating to decide whether to value the flat at full market price, apply a discount, or decline to lend until remedial works are certified complete.

A clean A1, A2 or B1 rating generally allows the transaction to proceed as normal. An A3 or B2 rating can see a lender value the property at £0 or refuse the mortgage entirely, which is why thousands of leaseholders found themselves unable to sell or remortgage in the years following Grenfell.

Government intervention has gradually reduced the scale of this problem. Of 516 high-rise buildings identified with Grenfell-style ACM cladding, 93% (478 buildings) have completed remediation or are awaiting building control sign-off, according to the House of Commons Library (2026). Yet the wider picture remains significant: at the end of July 2024, the department responsible was monitoring 4,630 residential buildings, of which 3,280 (70%) had yet to complete remediation, per the House of Commons Library (2024). More recent figures confirm progress is ongoing but incomplete: the UK Government now tracks 4,724 high-rise buildings with unsafe cladding, with 39% fully remediated, 15% under way and 46% still waiting for works to start, per Hansard (2026).

Transparency around EWS1 outcomes has also lagged. Only 2.6% of EWS1 forms had been uploaded to the Building Safety Information Portal by estimates in April 2024, according to End Our Cladding Scandal's written evidence to Parliament (2024), meaning many prospective buyers and lenders still cannot easily verify a building's status before agreeing terms.

Who signs the EWS1 form and who commissions it?

A chartered surveyor or fire engineer with appropriate competence signs the EWS1 form, following training and assessment criteria set by RICS. RICS reported that 492 assessors were undertaking the EWS assessment training course at the time new guidance was introduced, per Housing Today (2021), reflecting the specialist nature of the role.

Commissioning the assessment is the freeholder's responsibility in nearly all cases, since they own and control the building's external structure. Managing agents often arrange the survey on the freeholder's behalf, but the legal obligation sits with the building owner, not the leaseholder or the selling agent.

Where a freeholder refuses or delays commissioning an EWS1 form, leaseholders have limited but real options. These include raising the issue through the managing agent, contacting the Leasehold Advisory Service, or in persistent cases applying to the First-tier Tribunal for a determination — though this route can be slow and costly for an individual leaseholder to pursue alone.

For compliance teams managing multiple residential or mixed-use assets, the practical challenge is often less about the EWS1 process itself and more about proving that interim fire safety measures — waking watches, patrol checkpoints, fire door inspections — are genuinely happening while remediation is scheduled. Mo Hassan, Managing Director at Priority First, puts it plainly when discussing officer deployment standards: "An SIA licence is the floor, not the standard. We screen work history, right to work and references before anyone wears our uniform, because in this industry you are only ever as good as the last officer you deployed. One weak hire can undo years of trust, and we hire like we believe that."

That same discipline applies to evidencing fire safety compliance. On a mixed-use West London development with 152 photographed checkpoints across retail, residential, service yards and plant rooms, Priority First's officers now complete every checkpoint with a photo, GPS location and timestamp — closing the gap between what a patrol log claims and what actually happened overnight. Since going live in February 2026, the site has recorded over 540 photo-backed patrols across its first five months, giving the freeholder a defensible record during the period between EWS1 assessment and full remediation.

EWS1 form vs Fire Risk Assessment vs FRAEW: what's the difference?

An EWS1 form and a Fire Risk Assessment (FRA) are not interchangeable documents, and confusing them causes real delays in property transactions. The FRA, required under the Regulatory Reform (Fire Safety) Order 2005, covers the whole building's fire safety — doors, alarms, escape routes, compartmentation — while the EWS1 form looks only at the external wall.

A FRAEW (Fire Risk Appraisal of External Walls) sits between the two. It is a more detailed technical appraisal of the external wall system, carried out under the British Standards Institution's PAS 9980:2022 specification, and is often used to inform or replace an EWS1 form for complex or high-risk buildings.

Document Scope Governing standard Typical use
EWS1 form External wall cladding only RICS/UK Finance joint standard Mortgage valuation
Fire Risk Assessment Whole building fire safety Regulatory Reform (Fire Safety) Order 2005 Ongoing legal compliance
FRAEW Detailed external wall appraisal BSI PAS 9980:2022 Technical remediation planning, informs EWS1

A building can hold a satisfactory Fire Risk Assessment and still require an EWS1 form, because the two documents answer different questions for different audiences — one for the fire authority and occupants, the other for the mortgage lender.

What to do if an EWS1 form reveals dangerous cladding

An A3 or B2 rating on an EWS1 form means a surveyor has identified combustible materials or inadequate fire safety measures requiring remedial works. The freeholder's first obligation is to commission interim safety measures — typically a waking watch, revised fire alarm coverage, or additional patrols — while a remediation plan is developed.

Leaseholders in buildings over 11 metres affected by historical cladding defects may be protected from footing the bill directly under the Building Safety Act 2022, with funding routes including the Cladding Safety Scheme or a Developer Remediation Contract where the original builder has signed up. Building owners should register affected buildings promptly, since delays in registration can slow access to these funding streams considerably.

Interim measures need to be verifiably delivered, not just promised on paper. Priority First, which runs 24 sites, moved its entire security and facilities management operation (patrols, alarm response, shift handovers) onto a single platform, with 4,900+ patrols completed and photo-backed across the portfolio and 11+ field officers operating on one system, per the company's own operational record. That level of evidenced activity matters when a freeholder needs to demonstrate to a lender, insurer or tribunal that interim fire safety measures are genuinely in place, not just written into a waking watch contract.

Your external wall fire review EWS1 checklist

  • Confirm your building's height and cladding type against RICS's current EWS1 criteria before assuming a form is needed.
  • Identify who holds freeholder responsibility and confirm they have commissioned a RICS-qualified assessor.
  • Request a cost breakdown if EWS1 charges appear on your service charge, and challenge unclear figures through the Leasehold Advisory Service.
  • Check the form's signature date — remember it is valid for up to five years from signing.
  • If the rating is A3 or B2, ask what interim fire safety measures are in place and how they are evidenced.
  • Verify whether your building is registered for the Cladding Safety Scheme or a Developer Remediation Contract if defects were found.
  • Ask your managing agent whether the completed form has been uploaded to the Building Safety Information Portal.
  • Request photo-backed or timestamped evidence of any interim patrols, waking watches or fire-stopping checks, not just a written assurance.

FAQ

What is an EWS1 form used for?

An EWS1 form is used by mortgage valuers to assess fire risk in a building's external wall cladding before lending against a flat. RICS and UK Finance introduced it in December 2019 to standardise this assessment across the UK mortgage market.

Who is qualified to sign an EWS1 form?

A chartered surveyor or fire engineer with specific EWS assessment training signs the form. RICS reported 492 assessors were undertaking this training course when updated guidance was introduced in 2021, per Housing Today.

How long is an EWS1 form valid for?

An EWS1 form is valid for up to five years from the date it is signed, according to UK Finance and RICS (2022). After that point, a fresh assessment is generally required for mortgage purposes.

Do all high-rise buildings need an EWS1 form?

No, not all high-rise buildings need one. RICS's updated criteria mean buildings below 11 metres are very unlikely to require an EWS1 form, and demand has fallen from 62% of relevant valuations in Q2 2023 to 48% in Q2 2024, per RICS.

Who pays for the EWS1 assessment?

The freeholder or building owner is typically responsible for commissioning and initially paying for the EWS1 assessment. Costs are frequently passed to leaseholders through the service charge, though the Building Safety Act 2022 restricts this for certain historical cladding defects in buildings over 11 metres.

What's the difference between an EWS1 form and a FRAEW?

An EWS1 form is a short mortgage-lending certificate, while a FRAEW (Fire Risk Appraisal of External Walls) is a detailed technical appraisal carried out under BSI's PAS 9980:2022 standard. A FRAEW is often used to inform or replace an EWS1 assessment for complex buildings.

What happens if my freeholder won't provide an EWS1 form?

Raise the matter with your managing agent first, then escalate to the Leasehold Advisory Service if there is no progress. Persistent cases can be referred to the First-tier Tribunal (Property Chamber), though this process can take considerable time for an individual leaseholder.

Securing compliance while remediation works are under way

Priority First works with freeholders, managing agents and compliance teams who need interim fire safety measures delivered and evidenced while cladding remediation is scheduled or in progress — exactly the gap an A3 or B2 EWS1 rating creates. Through Facilities Management and Physical Protection / Manned Guarding, Priority First deploys SIA-licensed officers for waking watch cover, checkpoint patrols and building audits that produce a verifiable record rather than a paper assurance.

Priority First currently operates across prime central London — Chelsea, Knightsbridge and Mayfair — alongside West London and contracts in the West Midlands and Bedfordshire, protecting over £1.6 billion in client assets. If your building's EWS1 outcome has created an interim safety obligation you need covered and documented, get in touch with Priority First for a tailored quote.

Mo Hassan
Written by
Mo Hassan — Founder & Managing Director, Priority First

Mo Hassan leads Priority First, a UK building-management and security-services company operating across prime central London and nationwide. Mo writes on physical security, construction-site protection, CCTV, and building operations.

Over a decade in premium building management and security operations

Specialises in Building management, Security operations, Construction site security

Add priorityfirst.co.uk as a preferred source on Google